HYDROBUDOWA POLSKA S.A. belongs to PBG Group

Our projects

  • Sewage Treatment Plant Zabrze Rokitnica

    Sewage Treatment Plant Zabrze Rokitnica

    Zabrze
    105/172
  • Sewage Treatment Plant  Karkoszka - Wodzisław

    Sewage Treatment Plant Karkoszka - Wodzisław

    Wodzisław Śląski
    98/194
  • Artificial waterfall of Włocławek

    Artificial waterfall of Włocławek

    Włocławek
    106/76
  • Ski jump Wisła Malinka

    Ski jump Wisła Malinka

    Wisła
    114/210
  • E1 sewerage in Warszawa

    E1 sewerage in Warszawa

    Warszawa
  • National Stadium

    National Stadium

    Warszawa
    162/98
  • Sewage Treatment Plant Ustroń

    Sewage Treatment Plant Ustroń

    Ustroń
    107/202
  • Sewage Treatment Plant Siewierz

    Sewage Treatment Plant Siewierz

    Siewierz
    120/175
  • Modernization of Municipal Stadium in Poznań

    Modernization of Municipal Stadium in Poznań

    Poznań
    64/94
  • Waste landfill reclamation in Maślice

    Waste landfill reclamation in Maślice

    Maślice
    68/145
  • Reservoir Kuźnica Warężyńska

    Reservoir Kuźnica Warężyńska

    Kuźnica Warężyńska
    112/180
  • Sewage Treatment Plant Kraków Płaszów

    Sewage Treatment Plant Kraków Płaszów

    Kraków
    148/200
  • Stadium construction - PGE Arena of Gdańsk

    Stadium construction - PGE Arena of Gdańsk

    Gdańsk
    105/15
  • Modernization of water purification plant in Bydgoszcz

    Modernization of water purification plant in Bydgoszcz

    Bydgoszcz
    90/62

Click a point to see our realization.

News

2011-08-17

HBP at construction of the LNG terminal

The value of all works provided by Hydrobudowa Polska and commissioned by the general contractor of the terminal is net 111 million PLN.

  
Every day Hydrobudowa Polska is more engaged in the project of strategic importance for power safety of the state regarding Construction of the Liquefied Natural Gas Regasification Terminal in Świnoujście. The International Consortium of Saipem – Techint – PBG being the general contractor of this project has signed with HBP the next contract for erection and construction works. At the same time the total value of all contracts is net 110.9 million PLN.
 
Hydrobudowa Polska has been assigned with works regarding e.g. execution of pre-stressed reinforced concrete tanks of outer diameter almost 80 m and height over 50 m. At present foundation works are well under way. The design provides for full-containment tanks (tank inside tank). Inside the reinforced “shell” the cryogenic steel tank will be provided of 160 000m3 capacity which will be purposed for storage of liquefied gas at temperature of -163o C.
 
Works already commissioned to Hydrobudowa (at present talks are under way regarding extension of works scope) shall be completed till the half of 2013, so a year before the scheduled completion of the whole project regarding construction of the LNG terminal in Świnoujście.
 

Contact

Krzysztof Woch
IR director
krzysztof.woch@hbp-sa.pl
+48 781 859 191

Ujazdowskie 41
00-540 Warszawa
tel.: +48 22 31 95 700
fax: +48 22 31 95 707